At the Hopper: Concrete Pump Maintenance - Series 1

Event Date: 
05/24/2023 - 1:30pm to 2:30pm

    Concrete Pump Maintenance - Series 1

    Special guests include:

    • Jeff LaBounty, National Fleet Manager - Brundage Bone Concrete Pumping
    • Daryl Heinz, National Fleet Manager - Western Concrete Pumping
    • Gary Brown, RL McCoy, Inc.
    • Jim Bodeker, Construction Forms

    Also attending will be service experts from many of the equipment manufacturers!

    Roundtable Limit: 30 Attendees
    Duration: 60 Minutes

    Share your tips for maintaining your pump and truck to help avoid those costly unexpected breakdowns and keep your units ready to roll!

    Talking points include but not limited to:

    1. Preventive pump maintenance

    • Estops
    • Waterbox
    • Accumulator
    • Boom inspections

    2. Backend Maintenance

    • Auto Greasers
    • Greasing after every job
    • Wear Parts

    3. Agitator Maintenance

    4. Boom pipe

    • Inspection
    • Testing for pipewall thickness
    • When to replace

    5. Inspection points

    6. Diagnostic tools

    7. Checklists

    8. Preventive truck maintenance

    • Tires
    • Fluids

    Space is limited to 30 persons so don’t miss this exciting opportunity to participate. Use the link below to register early and secure your place “At the Hopper”!

    NOTE: Talking points will be spread out and updated over several sessions as time allows and we'll dive deeper into the topics you want to discuss most as the series continues. 


    A zoom link will be emailed to registered participants as the event date approaches. Please direct questions to Janet Kasson at the ACPA National Office or call 614-431-5618 for more information.